Multistage horizontal stimulation is a key technique in the development of unconventional oil and gas reservoirs, such as shale and tight formations. It involves dividing a horizontal wellbore into multiple isolated sections (or “stages”) and stimulating each individually using hydraulic fracturing to maximize contact with the reservoir.
Goldburg Drilling & Completion Consulting Inc. is a multi-national oil and gas consulting firm offering petroleum engineering services, operational oversight, and on-site supervision for drilling, completion, and frac operations.